Continuous louvre wall for intensive ventilation Sancroft building in London

Price Engineered Solutions, renowned for their leadership in supplying heating and ventilation components for key projects across the UK, recommended to the architects of the Sancroft office building to work with DUCO for the installation of intensive ventilation.

Continuous louvre wall for intensive ventilation Sancroft building in London

Nestled in the vibrant heart of London, Sancroft is an office building that stands tall, a commanding structure that spans over 10 floors with 2 levels of basement with a GIA of circa 429,000sqft. When the building’s architects, Buckley Gray Yeoman Ltd, were tasked with providing intensive ventilation in the building, they turned to Price Engineered Solutions for advice.

Price Engineered Solutions are renowned for their leadership in supplying heating and ventilation components for key projects across the UK. They recommended the architects to work with DUCO for the installation of intensive ventilation.

A Breath of Fresh Air: Continuous louvre walls with value for money

To ensure the Sancroft building is ventilated naturally and continuously it was decided to install the sturdy, robust aluminium louvre-wall system, DucoWall Screening 70 & 75.

Innovative design and aesthetic appearance

What sets this project apart is its innovative design, which distinguishes it from the neighbouring structures.

John Biss continues: “This project is truly unique due to its innovative design. For instance, we had to incorporate bracketry to support a wire trelis that over time, will host climbing plants. The sleek appearance of the DucoWall Screening adds to the uniqueness of the building”.

Super-quick assembly and high airflow

The Z-shaped louvre blades of the DucoWall Screening are clicked directly onto the support section thanks to a direct clip system, ensuring super-quick assembly. The very large span and high airflow of the louvre wall ensures high ventilation values and thus an optimal indoor climate for all office workers present.

John Biss : « With Duco’s patented ‘Direct Clip’ system, the louvre blades are clicked onto the support section directly, ensuring fast installation. In a world where everything has to be delivered very quickly and the next job is waiting in line, this is a very welcome asset!”

Fine collaboration and positive feedback

The collaboration between other parties, such as Britplas, a leading commercial glazing specialist in the UK, and the engineers and contractors was excellent. We had open communications between all parties involved which led to yet another project going off without a hitch”.

"Our client expressed profound satisfaction, not only with the DucoWall Screening louvre wall but also with our adapt management of the design and installation process all while minimizing disruptoin to other trades.”

As John Biss aptly concludes,” We’ve delivered a project that exceeds expectations, offering a breath of fresh air in every sense.

Architect: Buckley Gray Yeoman Ltd

Building contractor: Price Engineered Solutions

Commercial glazing specialist: Britplas

Learn more about DUCO continuous louvre walls?

Download the brochure, contact us for a personal appointment.

 

Technische eigenschappen

Ontdek alle technische eigenschappen in de technische fiche.

Caractéristiques techniques

Découvrez toutes les caractéristiques techniques dans la fiche technique.

Technical properties

Discover all the technical features in the technical datasheet.

Technische Eigenschaften

Entdecken Sie alle technischen Merkmale im technischen Datenblatt.